River profile of Mindanao River and Pulanggi River

Requested from MinDA by S. Spalding at 08:00 AM on Jul 30, 2019.
Purpose: Thesis/ Capstone
Date of Coverage: 07/29/2019 - 07/29/2019
Tracking no: #MinDA-083573984566

Spalding 08:00 AM, Jul 30, 2019

We are the 5th year civil engineering students from the Technological Institute of the Philippines (T.I.P) at Quezon City. Our culminating design requirement is a project in the field of water resource engineering. The project is a design of flood mitigation of Mindanao River on both right and left bank under Tunggol Bridge II located at Brgy. Tunggol, Datu Montawal, Maguindanao, considering multiple constraints, trade-offs, and standards to enable us to select the most economical, safest, and sustainable project.

No river profiling was conducted to the Pulanggi River

Is this request offensive?

Requests for personal information and vexatious requests are not considered valid requests for Official Information.

If you believe this request is not suitable, you can report it for attention by the site administrators.